AT&T DEMOUNTABLE POD

CASE STUDY

Aluminum construction
Demountable hydraulic legs
Storage box on the trailer
Pre-engineered
Easy to close when bad weather approaches

LYDIAN DENTAL

CASE STUDY

53′ expandable dental clinic
4 exam rooms
Panoramic X-ray room
Consultation room
Sanitation and break rooms
ADA wheelchair lift

VERIZON 5G AT NFL KICKOFF

CASE STUDY

Patent pending Architect Series

20′ X 20′ pre-engineered structure

Air conditioning and power were rented on site

14′ tall

NINTENDO

CASE STUDY

53′ expandable stage trailer

Off board gaming

Stage interactives

Temperature controlled Interior gaming

24′ frame awning

Big Ideas. On Time. On Budget.®

FEATURED PROJECTS

    Phone

    Email

    info@cgspremier.com

    Address

    S64 W15586
    Commerce Center Parkway
    Muskego, WI 53150

    COPYRIGHT © 2019 CGS Premier | Please Note: CGS Premier is a Fabrication Provider and NOT an Experiential Marketing Agency